Principal Contractor

IMPRESA PERCASSI S.p.A.

Services

Cost & Value Engineering

Building Type

Residential

Cost of Works

reserved

Floor Area

30.000 Mq

Timeline

2023

Location

Milano

Project ADRIAN

In the project, volumes alternate and create a visual filter between the road and the Park. The construction plays with filled and empty spaces that maximize the quality of the views. There are 4 tower buildings including about 500 housing units overall: one tower is split in a 13 floors section and a 22-floor section, whereas the other three buildings count respectively 16, 18 and 20 floors above ground.

The entire area features 3 underground floors for parking with private garages and parking spots, basement storage units and technical rooms.

The towers position generates two courtyards overlooking the park and the road, green areas designed to be a place for meetups and social interaction or sports and recreational activities.

In our project analysis to find alternatives for cost control, we considered the technical aspects when exploring the most competitive construction systems with equal performance as well as the financial side when looking for the more cost-effective materials.